TUBE EXPO 2024
Visitor Registration Booth Application Newsletter
Countdown
Days
Hours
Min
Sec

transfluid Reduces Set-Up Times

Greater flexibility thanks to secure tool systems and setting-up procedures for all aspects of tube processing


The demand for greater process flexibility in tube manufacturing keeps growing. That includes minimizing idle time, such as the set-up time, from the very start to the first finished component that meets the specifications. During the set-up time the chances of the operator making a mistake should be minimized or even completely eliminated. Therefore, the processes need to be secured and there shouldn’t be any possibility of a tool mix-up.

The Japanese principle of “Poka Yoke” teaches us that it is possible to prevent errors by incorporating multiple elements with technical features, such as immediate detection and prevention of errors. This is particularly important in the case of complex machines and production units that have to meet exacting demands.

Systems to get into the right position and geometry

To achieve an even safer and more effective tube production, the solution-finders at machine manufacturers transfluid have further developed and improved their whole product range.  With the t bend bending machines it is no longer necessary to make any manual adjustments on electrically powered units. Bending tools can be mounted securely on the bending machine to reduce set-up time. In addition to that, all tool components can be assigned a code in a corresponding system. This coding ensures that the right tools are used for the product and that they are positioned correctly; it also ensures that the parameters for the required geometry are applied.

Checking that the right equipment is being used can be done either with a manual scanner or automatically. Special crease smoothers can now locate their exact position again, with accuracy and no manual intervention, thanks to the positioning with brushless drives motors.
The tool technique is perfectly matched to the product.

“These secure tool systems and set-up processes are suitable for our bending machines and also for most of the forming machines. I am happy to see how we have achieved our goal of delivering faster and safer set-up processes to our clients”, sums up transfluid director Stefanie Flaeper. The set-up times for the first, accurate part can be measured in single-digit minutes for standard tubes with 90mm diameters. An actual example comes from a t bend machine that bends counterclockwise and  and clockwise, for the production of tubes with diameters of up to 30mm. In this case the operator can set up the tools for the left and right production areas in just three minutes. This achieves the objective of high and reliable flexibility and minimization of the set-up time.

Source: Wire and Tube News
中国sで紧缚调教论坛| 黄色网址免费观看视频| 爱豆传媒视频在线网址最新| 四虎永久免费影院| 色多多成视频人在线观看| 国产偷窥熟女精品视频| 色噜噜狠狠狠狠色综合久一| 国产不卡在线观看| 精品日韩在线视频| 国产大片中文字幕在线观看| 蜜桃成熟时2005| 国产乱子伦农村XXXX| 精品视频一区二区三三区四区| 噗呲噗呲好爽轻点| 色偷偷8888欧美精品久久| 国产成人精品一区二区三区免费| 99re6这里只有精品| 好男人神马视频在线观看| 中文字幕35页| 天天综合天天做| a级毛片免费网站| 国产精品天堂avav在线| av区无码字幕中文色| 国产精品大片天天看片| 青青青青青国产免费手机看视频| 国产凌凌漆国语| 色老头在线一区二区三区| 国产一级一片免费播放视频| 精品久久综合一区二区| 免费无遮挡毛片| 欧美福利在线播放| 任你躁欧美一级在线精品| 欧美巨大另类极品videosbest| 亚洲精品乱码久久久久久蜜桃图片| 欧美婷婷六月丁香综合色| 亚洲a∨无码精品色午夜| 日本精品少妇一区二区三区| 久久国产高清字幕中文| 很黄很污的视频网站| chinese体育男白袜videogay| 国产精品偷伦视频观看免费|