TUBE EXPO 2024
Visitor Registration Booth Application Newsletter
Countdown
Days
Hours
Min
Sec

transfluid Reduces Set-Up Times

Greater flexibility thanks to secure tool systems and setting-up procedures for all aspects of tube processing


The demand for greater process flexibility in tube manufacturing keeps growing. That includes minimizing idle time, such as the set-up time, from the very start to the first finished component that meets the specifications. During the set-up time the chances of the operator making a mistake should be minimized or even completely eliminated. Therefore, the processes need to be secured and there shouldn’t be any possibility of a tool mix-up.

The Japanese principle of “Poka Yoke” teaches us that it is possible to prevent errors by incorporating multiple elements with technical features, such as immediate detection and prevention of errors. This is particularly important in the case of complex machines and production units that have to meet exacting demands.

Systems to get into the right position and geometry

To achieve an even safer and more effective tube production, the solution-finders at machine manufacturers transfluid have further developed and improved their whole product range.  With the t bend bending machines it is no longer necessary to make any manual adjustments on electrically powered units. Bending tools can be mounted securely on the bending machine to reduce set-up time. In addition to that, all tool components can be assigned a code in a corresponding system. This coding ensures that the right tools are used for the product and that they are positioned correctly; it also ensures that the parameters for the required geometry are applied.

Checking that the right equipment is being used can be done either with a manual scanner or automatically. Special crease smoothers can now locate their exact position again, with accuracy and no manual intervention, thanks to the positioning with brushless drives motors.
The tool technique is perfectly matched to the product.

“These secure tool systems and set-up processes are suitable for our bending machines and also for most of the forming machines. I am happy to see how we have achieved our goal of delivering faster and safer set-up processes to our clients”, sums up transfluid director Stefanie Flaeper. The set-up times for the first, accurate part can be measured in single-digit minutes for standard tubes with 90mm diameters. An actual example comes from a t bend machine that bends counterclockwise and  and clockwise, for the production of tubes with diameters of up to 30mm. In this case the operator can set up the tools for the left and right production areas in just three minutes. This achieves the objective of high and reliable flexibility and minimization of the set-up time.

Source: Wire and Tube News
四虎麻豆国产精品| 你是我的女人中文字幕高清 | 欧美日韩你懂的| 伊人久久久久久久久香港| 波多野结衣免费观看视频| 伊人影视在线观看日韩区| 欧美高大丰满freesex| 国产精品自在线观看剧情| 99re免费99re在线视频手机版| 国产裸舞福利资源在线视频| 中文字幕一精品亚洲无线一区| 成人毛片免费在线观看| 中文字幕手机在线播放| 好大好硬好深好爽想要之黄蓉 | 中文字幕亚洲一区二区三区| 妞干网在线免费视频| 一二三四在线观看免费高清视频 | 免费观看美女用震蛋喷水的视频| 激情五月激情综合网| 亚洲精品午夜国产va久久成人 | 免费va人成视频网站全| 欧美精品在线观看| 亚洲日韩久久综合中文字幕| 极品尤物一区二区三区| 亚洲av无码一区二区二三区| 日本久久中文字幕精品| 久久久久久亚洲精品不卡| 婷婷久久综合九色综合绿巨人| zztt668.su黑料不打烊| 在人间电影在线观看完整版免费| 97久久精品人人做人人爽| 国产日韩精品欧美一区| 色综合合久久天天给综看| 四虎精品在线视频| 狠狠噜天天噜日日噜视频麻豆| 亚洲精品视频久久| 最近中文字幕免费mv视频| 久久精品国产导航| 性久久久久久久| gay网在线观看| 国产第一页亚洲|