TUBE EXPO 2024
Visitor Registration Booth Application Newsletter
Countdown
Days
Hours
Min
Sec

transfluid Reduces Set-Up Times

Greater flexibility thanks to secure tool systems and setting-up procedures for all aspects of tube processing


The demand for greater process flexibility in tube manufacturing keeps growing. That includes minimizing idle time, such as the set-up time, from the very start to the first finished component that meets the specifications. During the set-up time the chances of the operator making a mistake should be minimized or even completely eliminated. Therefore, the processes need to be secured and there shouldn’t be any possibility of a tool mix-up.

The Japanese principle of “Poka Yoke” teaches us that it is possible to prevent errors by incorporating multiple elements with technical features, such as immediate detection and prevention of errors. This is particularly important in the case of complex machines and production units that have to meet exacting demands.

Systems to get into the right position and geometry

To achieve an even safer and more effective tube production, the solution-finders at machine manufacturers transfluid have further developed and improved their whole product range.  With the t bend bending machines it is no longer necessary to make any manual adjustments on electrically powered units. Bending tools can be mounted securely on the bending machine to reduce set-up time. In addition to that, all tool components can be assigned a code in a corresponding system. This coding ensures that the right tools are used for the product and that they are positioned correctly; it also ensures that the parameters for the required geometry are applied.

Checking that the right equipment is being used can be done either with a manual scanner or automatically. Special crease smoothers can now locate their exact position again, with accuracy and no manual intervention, thanks to the positioning with brushless drives motors.
The tool technique is perfectly matched to the product.

“These secure tool systems and set-up processes are suitable for our bending machines and also for most of the forming machines. I am happy to see how we have achieved our goal of delivering faster and safer set-up processes to our clients”, sums up transfluid director Stefanie Flaeper. The set-up times for the first, accurate part can be measured in single-digit minutes for standard tubes with 90mm diameters. An actual example comes from a t bend machine that bends counterclockwise and  and clockwise, for the production of tubes with diameters of up to 30mm. In this case the operator can set up the tools for the left and right production areas in just three minutes. This achieves the objective of high and reliable flexibility and minimization of the set-up time.

Source: Wire and Tube News
美女AV一区二区三区| 欧美黑人疯狂性受xxxxx喷水| 四虎永久免费影院| 美女黄视频免费| 国产ts人妖视频| 精品久久欧美熟妇WWW| 啦啦啦www播放日本观看| 竹菊影视国产精品| 午夜国产羞羞视频免费网站| 精品国产麻豆免费人成网站| 又色又爽又黄的视频软件app| 男女一级爽爽快视频| 免费a级毛片高清在钱| 欧美色欧美亚洲高清在线观看| 亚洲第一黄网站| 欧美一区二区久久精品| 亚洲人成图片小说网站| 风流女护土一级毛片| 国产女人18毛片水| 色94色欧美sute亚洲线| 喷出巨量精子系列在线观看| 疯狂做受XXXX国产| 人妻免费久久久久久久了| 欧美性xxxx极品hd欧美风情| 亚洲伊人成无码综合网| 日本边添边摸边做边爱边视频| 久久人妻内射无码一区三区| 性感的瑜伽教练| z0z0z0另类极品| 国产精品萌白酱在线观看| 18禁美女裸体免费网站| 国产性猛交╳XXX乱大交| 美女毛片一区二区三区四区| 公与秀婷厨房猛烈进出视频| 欧美金发大战黑人video| 亚洲国产日韩在线成人蜜芽| 日本爱恋电影在线观看视频| 中文字幕电影在线观看| 成全动漫视频在线观看免费播放 | 无码日韩精品一区二区免费| 中文字幕无码日韩欧毛|